- Messages
- 1,514
- Location
- Sussex, UK
Did some measuring and a single layer of 12.5mm thick plaster board to cover the alcoves and chimney breast from floor to ceiling (~24sqm) costs about £300. Double that for two layer plus the cost of wood for studding, sealant, plastering, painting etc. That does not include any work to the floor or ceiling. It's not the money per se, more the bother and whether the results justify the outlay. I can the Law of Diminishing Returns applying here.
As there haven't been any complaints for months I won't bother. I think it's more me being worried than them being disturbed.. apart from her grumpy old lodger, ex Para, calls it my trombone, and doesn't like jazz.. I get two hours a week band practice where I can blow to my heart's content, and can practise long tones and dynamics in the bathroom.
Thanks for all the suggestions.
As there haven't been any complaints for months I won't bother. I think it's more me being worried than them being disturbed.. apart from her grumpy old lodger, ex Para, calls it my trombone, and doesn't like jazz.. I get two hours a week band practice where I can blow to my heart's content, and can practise long tones and dynamics in the bathroom.
Thanks for all the suggestions.

