I will need to switch host for the BR from 1 & 1. This is because 1 & 1 have a restriction on the size of a MysQL database
When ever I've done this before the domain is usually down for 24 hours or more and you just have to keep trying the domain on the new host (waiting for it to propagate or something).
Anyone know of a way to do this without such a long and indeterminate down time. The proposed new host (eukhosting) have told me I just have to keep trying, that there is no way of scheduling things. And of course while it's propagating the domain just doesn't work so no redirects are possible, there'll just be an error message.
When ever I've done this before the domain is usually down for 24 hours or more and you just have to keep trying the domain on the new host (waiting for it to propagate or something).
Anyone know of a way to do this without such a long and indeterminate down time. The proposed new host (eukhosting) have told me I just have to keep trying, that there is no way of scheduling things. And of course while it's propagating the domain just doesn't work so no redirects are possible, there'll just be an error message.
